Council has comprised a list of actions and measures you can take to achieve erosion and sediment control (ESC) compliance. These measures are suitable for gently sloping house sites that are less than 1000 square metres.
To reduce the risk of erosion, ensure:
To maintain adequate drainage, you should:
Proper sediment control measures include:
All ESC measures must be contained within the property boundary. This excludes:
To minimise waste and protect the environment, ensure:
There are many benefits to adopting best practice ESC, some are:
For more information refer to Water by Design.