Woorim Beach sand back-passing trial - quarterly update

Published 12 July 2021

  • Period covered by this update: 1 April to 30 June 2021
  • 30 active pumping days.
  • Total volume pumped during this period: 13,106 cubic metres
  • Total volume pumped to-date (since inception): 42,189 cubic metres

The graph shows the daily and cumulative pumping volume from the 1 April to 30 June 2021.

Woorim Beach sand back-passing trial - graph of daily and cumulative pumping volume for the quarter
Tagged as: