Culvert Upgrade - King Street, Moodlu

Roads project banner

The project aims to reduce the frequency of flooding at the proposed site by increasing the capacity of the stormwater drainage. The works will involve replacing the existing stormwater crossing on King Street with larger culverts, including the installation of associated end structures, scour protection, turfing of channels and pavement reinstatement.

The project will include:

  • bulk earthworks
  • stormwater drainage installation
  • gravel pavement construction
  • asphalt resurfacing
  • landscaping.

Location

King Street, Moodlu 4510  View map

Google Map